Operational & Under Construction, december 31, 2009
|
Country |
Operational |
Under Construction |
||||
| Projects | Turbines | MW | Projects | Turbines | MW | |
| U.K. | 10 | 288 | 868 | 6 | 581 | 2.074 |
| Denmark | 11 | 315 | 663 | 1 | 90 | 207 |
| Netherlands | 4 | 126 | 247 | |||
| Sweden | 6 | 76 | 164 | |||
| Germany | 4 | 15 | 72 | 3 | 188 | 697 |
| Belgium | 1 | 6 | 30 | 2 | 79 | 309 |
| Finland | 1 | 10 | 30 | |||
| Ireland | 1 | 7 | 25 | |||
| Spain | 1 | 5 | 10 | |||
| China | 2 | 8 | 23 | 1 | 27 | 81 |
| Norway | 1 | 1 | 2,3 | |||
| Japan | 1 | 2 | 1 | |||
| Total | 43 | 859 | 2.134 | 13 | 965 | 3.368 |

Operational & planned offshore projects at
WIKIPEDIA Offshore Wind Farms
Table of Operational & Planned Offshore in Europe by EWEA
Details planned projects, listed by W.S.H.
Last up-dated:
15 maart 2010
|
Site
, Country |
On-line |
Turbines / Hub Height
Capacity |
Water depth |
Developer / Owner |
Distance to shore |
GWh / Y |
| Under Construction, on-line 2010 Total 938 M | ||||||
|
Clacton on Sea Gunfleet Sands-1 & 2 Essex, UK |
January ? 2010 |
48 * Siemens 107 - 3.600 / 75 173 MW |
Monopile | 8 km. | 9 m/s at 80 m. | |
| Nysted- II, DK | 2010 | 90 * Siemens 93 / 2.300 - 69 | Gravity | E.On | 800 | |
|
Outer Thames, UK |
2010 |
100 * Vestas V 90-3.000 / ... 300 MW |
20-25 m. Monopile |
Vattenfall | 12 km. | |
|
Shanghai, Donghai Bridge China |
2010 |
31 * Sinovel 90 - 3.000 / 90 93 MW - € 2.400/kW |
10 m. |
Shanghai Dong Hai Windpower |
1-4 km. |
268 |
|
Zeebrugge, Bligh Bank "Belwind", Belgium |
december 2010 |
55 * V 90 - 3.000 / ...... 165 MW - 2.575 / kW |
20-35 m. Monopile |
Colruyt, PMV, SHV, Rabo, Meewind | 47 km. from Zeebrugge | 540 |
| Under Construction, on-line 2011 Total 1.296 MW | ||||||
|
Bard Offshore I Germany, North Sea |
summer 2011 |
80 * Bard 122-5.000 / .... 400 MW |
40 m. Tripod |
Bard (building & operating) SWDS & WV Energie (owner) |
90 km NW from Borkum |
1.600 |
| Ormonde Wind & Gas | 2011 | 30 * Repower 5M, 150 MW | monopile, 20 m. | Vattenfall | Vattenfall | |
|
Baltic I Baltic Sea, Germany |
2011 |
90 * Siemens 93 - 2.300 / ... 207 MW |
Monopile | E.On | ||
|
Weser-Mündung, Germany |
2011 |
18 * Repower 126-5.000 / ... 90 MW |
2-18 |
Energiekontor |
15 km off Wilhelshaven | |
|
Norfolk, UK |
2011 |
88 * Siemens 107-3.600 / ... 316,8 MW - 31,560 NOK / kW |
16-22 | Statoil Hydro / Statkraft | 17-23 km | 1.100 |
|
Thornton Bank, - 2 Zeebrugge, Belgium |
2011 |
24 * REpower 6M 144 MW |
30 m. Gravity ? |
C-Power / RWE | 30 km | 450 |
| Under Construction, on-line 2012 Total 1.134 MW | ||||||
| London Array *** | 2012 |
175 * Siemens SWT 120 - 3.600/.... 630 MW |
Dong, E.On, Masdar | Outer Thames Est., 23 km | ||
| Greater Gabbard, U.K. | 2012 |
140 * Siemens 107-3.600 / .... 504 MW |
24-34 m. Monopile |
SSE / RWE | 23 km off Suffolk | 1.900 |
|
Planned Projects Off- & Nearshore The Netherlands |
||||||
|
Links: Noordzeeloket - We @ Sea - Map Operating Turbines North Sea - WSH-News offshore (Dutch) - Roadmap to 20.000 MW |
||||||
|
* Wieringermeerdijk * IJsselmeer |
2015 ? |
30-40 turbines ~ 100 MW |
2 m. |
NUON / WCI |
800 m. |
|
|
IJsselmeer |
2013 ? |
30 - 45 turbines 180-250 MW |
4 m. |
Westermeerwind |
500 - 1.200 m. |
|
|
IJsselmeer |
2013 ? |
26 - 30 turbines 100 - 160 MW |
4 m. |
400 m. |
|
|
|
North Sea |
2014 - 2016 ? | ~ 3.200 MW | 20-35 m. | Airtricity , Eneco, RWE , Brown Ridge Oost, NUON, Bard, Evelop | 15-35 km | |
|
* = near shore * These 12 licensed North Sea projects have to compete in a max. 950-1.000 MW tender procedure, to be settled before May, 2010 |
||||||
|
More Planned Projects |
||||||
|
SWEDEN |
||||||
| Bornholm | 2015-2020 |
500 * 5 MW 2.500 MW |
|
Blekinge offshore AB |
|
5.000 |
|
Kriegers Flak II Baltic Sea |
2014 ? |
128 turbines Max. 640 MW |
16-24 m. |
Vattenfall |
35 km NW from Rügen |
2.100 |
|
Utgrunden - II ** |
2012 ? |
86 MW |
|
E.On |
7 km. |
280 |
|
Klasarden, Gotland |
2012 ? |
42 MW |
7-11 m. |
1,5 km. |
120 |
|
|
Sodra Midsjobanken Baltic Sea |
2012 ? | 1.000 MW | 50 km SE from Oland | 3.000 | ||
|
Hanobukten Bay, South East SW |
2012 ? |
250-300 MW |
|
Vattenfall / Wallenstam |
|
1.000 |
|
Skottarev Kattegat ,South-West Sw. |
|
90 - 180 MW |
|
Favonius |
8 km. |
|
| Stora Middelgrund, Kattegat* |
2013 ? |
108 * 8 MW 860 MW |
|
|
|
|
|
Finngrunden, Baltic Sea |
2014 ? |
300 * 5 MW 1.500 MW |
|
WPD |
40 km off Gavle |
5.000 |
|
UNITED KINGDOM Info at BWEA Crown Estate - Offshore |
||||||
|
Teesside,
Yorkshire |
? |
30 turbines 90 MW |
|
EDF |
1,5 km |
|
|
Tunes Plateau Nothern Ireland |
? | 30 turbines | RES / B9 | 5 km North Port Stewart | ||
|
Docking Shoal Dudgeon, Cromer Lincs *** |
? 2013 ? 2014 ? 2013 ? |
500 MW 60-100 turbines 1.200 MW 75 * Siemens 120-3.6 ? |
Centrica Warwick RWE Centrica Centrica |
? Off Cromer 33 km 8 km ? |
||
|
Walney Island, I & II Walney, Duddon * |
2012 2013 ? |
102 * Siemens 120-3.6, 367 MW 500 MW |
? ? |
Dong Scottish Power |
14 km. 15 km |
|
| Gwynt y mor - N. Wales ** | 2014 ? |
250 turbines 750 - 1.250 MW |
12-34 |
RWE |
14 km from Rhyl | |
|
Atlantic Array Off Ilfracombe, North Devon |
? |
350 turbines 1.500 MW |
|
RWE |
20 km |
|
|
Humber Gateway N.E. England |
? |
300 MW |
|
|
|
|
| Aberdeen, Scotland | 2011 | 115 MW | Vattenfall / AREG | 4 km | ||
| 10 sites Scotland, consessions awarded | 2015 - 2020 ? | 6.438 MW | 7 developers | |||
| "Round 3", 9 area's awarded | 2015 - 2020 ? | 32.000 MW | 9 Consortia | 9 area's | ||
|
BELGIUM
Info
Projects Belgium
Map Belgium Offshore sites
|
||||||
|
Zeebrugge Thornton Bank, - 3 *** |
2013 (24 turbs) |
24 * Repower 6M 144 MW |
30 m. |
C-Power / RWE |
30 km. |
|
|
Zeebrugge, Eldepaso
|
2012 ? |
36 * 6 MW | Electrawinds, Aspiravi e.a. | 38 km. | 735 | |
|
Zeebrugge, Bligh Bank
"Belwind" |
2012 ? |
55 * V 90 - 3.000 165 MW - 2.275 / kW |
20-35 m. | Colruyt, PMV, SHV, Rabo, Meewind |
46 km. from Zeebrugge |
540 |
|
Rental
|
2015 ? |
48 * 6 MW 288 MW - € 3.472/kW |
30 m. |
Electrawinds / Rent-a-Port |
30-35 km. |
|
| North Sea Power * | 2014 |
60 turbines, 360 MW € 4.166 / kW |
30 m. | Air Energy (Eneco) | 22 km. | 1.360 |
|
Zeebrugge 4 sites, with 9 competing developers |
2013 - 2015 ? |
900 MW ? |
20 - 30 m. |
Electrawinds, Electrabel NUON, e.o. |
22-45 km. |
|
|
U.S.A. |
||||||
|
Cape Cod, *** Boston, Mass. |
2012 ? |
130 turbines |
|
9 km. |
|
|
|
Galveston Island, Houston, Texas |
2013 ? |
150 MW |
|
15 km off Galveston Island |
|
|
|
Buzzards Bay Boston, Mass. |
? |
300 MW |
|
|
|
|
| Texas | ? | Four tracts | ||||
|
Delaware |
2013 ? |
150 * Vestas V 90 - 3.000 450 MW |
|
13 km. |
|
|
| Hull, Mass. | 2013 ? | 14 MW | 12-15 | 2,5 km | ||
| Rhode Island | ? | 338 turbines at 4 sites | ||||
|
Virginia Beach North Carolina |
? |
980 MW |
|
|
25 km. |
|
|
New Jersey, Cape May New Jersey, Atlantic City New Jersey, Atlantic City New Jersey, Atlantic City |
2014 ? 2014 ? 2014 ? 2016 ? |
350 MW 350 MW 350 MW 1.000 MW |
|
Garden State Offshore Energy NRG-Blue Water Wind Fishermans Energy Grays Harbor Ocean Energy |
25 25 ? 15 |
|
|
Mass. , Martha's Vineyard |
? |
1 demonstration turbine, 2009 120 turbines, 420 MW |
50 m. Floating |
Blue H USA |
40 km from Martha's Vineyard |
|
|
Lake Michigan - Milwaukee Lake Michigan Lake Erie, Cleveland |
? ? 2014 ? |
390 turbines 610 turbines 10 turbines |
? ? 19 |
Radial Wind Ewindfarm ? |
30 km 3 km 8 km |
|
|
FRANCE |
||||||
| Seine Maritime, Côte d'Albâtre English Channel, France | 2012 ? |
21 * Multibrid 116 - 5000 / ... 105 MW |
23 m. Tripod |
Enertrag / Prokon Nord | 6-11 km | 310 |
|
English Channel, Boulogne sur Mer |
2012 ? |
5 * Multibrid 5 MW 25 MW |
10-15 | Innovent | ||
| Britany, Calvados | ? | 3 projects, 1.150 MW | WPD | |||
|
Brittany, Cherbourg |
2013 ? |
100 MW |
|
Eole-RES |
|
|
| Brittany, Calvados | ? | 250 MW | Maia Power | |||
| Brittany, Baie de St. Brieuc | ? | 150 MW | Poweo | |||
| Brittany, Baie de St. Brieuc | ? | ? | Nass & Wind | |||
|
DENMARK Map Danish Offshore Wind Farms |
||||||
|
Kriegers Flak III Baltic Sea |
2013 ? |
800 MW |
|
|
|
|
|
Kattegat, Anholt |
2012 |
400 MW |
||||
|
GERMANY Project List Germany and General Map German Offshore Wind Farms Research at Alpha Ventus Projects pipeline |
||||||
|
Kriegers Flak I, Baltic Sea |
2013 ? |
80 turbines, 240 MW | 20-35 m. | EnBW | 30 km. MW from Rugen | |
|
Arkona Becken
* Baltic Sea |
2013 ? | 80 turbines | 23-36 m. | E.On | 32 km NWE from Rugen | |
|
Butendiek
* North Sea |
2012 ? |
80 * Siemens 107 / 3.600 2488MW |
16-22 m. | SSE , Aitricity | 34 km west from Sylt | 960 |
|
Borkum-Riffgrund
|
2012 ? |
77 + 96 turbines |
23-29 |
Dong |
34 km. |
|
|
Borkum-Riffgrund West
|
2013 ? |
80 * Multibrid 116 -5000 400 MW |
30-35 |
Energiekontor |
40 km NW Borkum |
|
|
Borkum West - II
|
2012 ? |
80 * Multibrid 116- 5000 400 MW |
Prokon Nord / Trianel | 45 km W from Borkum | ||
|
2013 ? |
44 turbines |
18-23 |
Enova / EWE |
15 kw NW from Borkum |
1.056 |
|
|
Baltic I, Darss *** Baltic Sea |
2012 ? |
8 * Nordex 90/2.000 11*Nordex N 90/2.500 5 * Repower 5M |
15-19 m. | 16 km. from Darss | ||
|
Sandbank Power |
2012 ? |
Pilot: 80 turbines Max. 980 turbines |
30-40 |
Okovest |
100 km west from Sylt |
1.600 |
|
Nordlicher Grund
North Sea |
2012 ? |
80 turbines max 400 MW |
23-40 m. |
Eolia Renovable |
86 km. W from Sylt |
|
|
Adler Grund * Baltic Sea |
2013 ? |
80 turbines max 720 MW |
|
40 km NE from Rugen |
|
|
| Geofree *** | ? | 5 turbines | 20 m. | Geo | 20 km. | |
|
Sky 2000 Mecklenburger Bucht |
2013 ? |
50 turbines 100 MW |
|
E.On |
15-20 km SE Fehmarn |
|
|
North Sea |
2013 |
48 * Repower 126/ 6.000 Max 288 MW |
19-24 |
RWE |
30 km NW Helgoland |
|
|
Ventotec Ost 2 Baltic Sea |
2013 ? |
50 turbines |
21- 34 , Floating Foundation |
Arcadis |
35 km NE from Rügen |
|
|
Arcadis Ost I * (Baltic Sea |
? |
70 turbines |
41-46 m. |
Arcadis |
17 km. |
|
|
Meerwind, North Sea
|
2012 ? |
80 turbines, max 270 |
22-32 m. |
Windland |
25 km N from Helgoland |
|
|
2011-2014 |
250 * Repower 5M 960 MW |
26-34 m. |
RWE |
40 km N from Juist |
3.000 |
|
|
Amrum
Bank West North Sea |
2012 ? |
80 turbines Max 400 MW |
21-25 m. |
E.On |
36 km SW Amrum |
|
|
Dan-Tysk, Sylt, |
2014 ? |
Pilot 80, max 300 turbines |
23-30 m. |
Vattenfall |
45 km West from Sylt |
|
|
Global Tech I |
2012 |
80 * Multibrid 5M 400 MW - 3.250 € / kW |
Gravity, 39-41 m. |
Wetfeet Offshore u.a. Stadw. Munchen, Hessen (50%) |
75 km North from Juist | |
|
Hochsee Windpark Nordsee |
2011 |
80 turbines, 400 MW |
39 m. |
EnBW |
90 km North from Borkum |
|
|
Gode Wind I Nordsee |
2012 ? |
80 turbines, 400 MW |
28-33 m. |
PNE |
33 km north from Isle of Norderney |
|
|
Gode Wind II Nordsee |
2014 ? | 80 turbines (Vestas ?) , 400 MW | 28-33 m. | PNE | 33 km north from Isle of Norderney | |
| Delta Nordsee 2 * | 2013 ? | Pilot 32 * 6 MW | 25-33 m. | E.On | 40 km. | |
|
Hoch-see Windpark * |
? |
80 turbines |
40 m. |
EnBW |
80 km N. from Borkum |
|
| Albatros | 2014 ? | 240 - 400 MW | 40 m. | Eneco | 100 Km. NW Borkum | |
| OWP West | 2014 ? | 240 - 400 MW | Eneco | 58 Km NW Borkum | ||
|
Deutsche Bucht |
? | 80 turbines | 40 m. | Eolic Power | 87 km. | |
| Austern Grund * | ? | 80 turbines | 40 m. | Global Wind Support | 87 km. | |
| Ventotec Nord I * | ? | 50 turbines | 41 m. | Arcadis Consult | 132 km. | |
| Ventotec Nord II * | ? | 50 turbines | 41 m. | Arcadis Consult | 104 km. | |
| H2-20 * | ? | 80 turbines | 30-40 m. | Geo | 200 km. | |
| Veja Mate * | 2013 ? | 80 turbines | 40 m. | Bard | 85 km. | |
| Beltsee, Baltic Sea * | ? | 50 turbines | 25-36 m. | PNE | 9 km. | |
| Beta Baltic, Baltic Sea * | ? | 50 turbines | 21 m. | E.On | 13 km. | |
|
CANADA |
||||||
|
Br. Col. Charlotte Islands Prince Rupert |
2014 ? |
110 * Siemens 107/3.600 396 MW |
10 - 15 m. |
Naikun Wind Energy Group |
10 m/s |
|
| Ontario, Prince Edward | ? | 700 MW | shallow | Trillium Power Wind C. | 15 km. | |
| Lake Ontario / Erie | 2015 ? | 140 turbines / 700 MW | AIM PowerGen | |||
|
CHINA |
||||||
|
Donghai
Bridge Shanghai |
2010 |
31 * Sinovel 3 MW 93 MW |
|
Guangdong Nuclear Power Holdings ,e.o |
|
|
|
Dongshan island, Guangdong |
2010 ? | 20 MW | 2 km. | |||
|
Hebei Bohai Sea |
2010 ? |
Pilot 50 MW Later 1.000 MW |
|
|
|
|
| Hong Kong | 2010 ? | 180 MW | 27 m. | Wind Prospect / Power HK | ||
|
TAIWAN |
||||||
|
|
|
600 MW |
|
|
|
|
|
SPAIN |
||||||
|
Cadiz, Huelva, Castellon |
2013-2015 ? |
6 projects, 3 sites, 3.000 MW |
Iberdrola |
|||
|
Cape Trafalgar e.o. |
2014 ? and later |
Different projects, totalling over 7.000 MW |
|
Enerfin, Endrosa, Acciona, Age Eolica, Capital Energy |
|
|
|
IRELAND |
||||||
|
Codling Bank, Wicklow |
2013 ? | 1.100 MW | Fred Olsen & Treasury Holdings | |||
|
Kish & Bray Banks, Dublin |
? |
500 MW |
|
Saorgus |
|
|
| Dundalk Bay | ? | 330 MW | Oriel Wind Farm | |||
| Arklow Bank - 2 | 2013 ? | 500 MW | Airtricity | |||
| Skerd Rocks, Galway | ? | 100 MW | Fuinneamh Sceide Teo | |||
|
NORWAY |
||||||
|
Moere - Romsdale Havsul I ** |
2012 ? | 78 turbines | 1.000 | |||
|
ITALY |
||||||
| Molise , South It. * | ? | 162 MW | Effeventi | |||
| Puglia, Brindise | 2010 ? | 1 * 2 MW | Floating, 100 m. | Blue H | ||
| Apulia | 2012-2014 ? | 66 * 4,5 MW | 14 - 22 m. | 10 km. | ||
|
Thyrrenean Sea, Tuscany |
? |
5 farms, total 400-500 MW |
|
Domus Energia |
|
|
| Sicily, Gulf of Gela | 2014 ? | 116 turbines | 30 m. | Enel | 5 km. | |
| Sicily, Gulf of Oristana | 240-320 MW | 15 - 30 m. | IARE | |||
|
FINLAND |
||||||
| Botnic Gulf | 2013 ? | 2 * 500 MW | Suomen Merituuli Oy | Off Helsinki | ||
| Gulf of Bothnia | 2012 ? | 50 - 800 MW | PVO / Oulu Energy | off Ouluhaukiputaan | ||
| Finngrunden, Baltic Sea | 2014 ? |
300 * 5 MW 1.500 MW |
|
WPD |
40 km. |
|
|
PORTUGAL |
||||||
| Coastal | 3 Phases | ? | deep / floating | Pinciple Power / EDP | ? | |
|
POLAND |
||||||
| Baltic Sea | 2020 | 5 Wind Farms, 1.000 MW + | Poland Energy Group (a.o) | |||
| INTERNATIONAL | ||||||
|
U.K. -Netherlands- Germany |
2012 - 2017 ? |
10.000 MW |
|
Airtricity |
|
35.000 |
Back To : Operational Offshore Wind Farms
Meer over offshore:
In Nederland bestond de stimulering van offshore windenergie tot 18 augustus 2006 enige tijd uit een subsidie van 9,7 Eurocent per kWh voor een periode van 10 jaar bovenop de waarde van de "grijze" stroom. Dit tarief is van toepassing op de gerealiseerde parken Prinses Amalia en Noordzeewind. Op 18 augustus 2006 werd het subsidiebedrag op nul gezet.
Het huidige kabinet streeft naar committering (subsidietoezegging) van 450 MW t/m 2011. Daarvan zou 250 MW in deze kabinetsperiode gerealiseerd moeten worden. In de loop van 2008 worden regelingen voor offshore-subsidies in 2009 bekend gemaakt.
Stand van zaken Noordzee-NL: Noordzeeloket.nl
Documenten bij www.inspraakpunt.nl .
Foto van het schip met molens Prinses Amalia aan de kade
Zie de foto van driepoten van 700 ton en 40 meter hoog van de Multibrid voor Alpha Ventus
Meer info over Prinses Amalia windpark.
Zie de Brief van 4-4-2008 aan de Tweede Kamer over vergunningenbeleid 450 MW en verder
Filmpje over actie Greenpeace voor wind op zee: http://www.new-energy.tv/ .
Actueel windaanbod nabij Egmond en IJmuiden Stroommeetpaal IJmond.
MORE WSH-PAGES
STATISTICS
MANUFACTURERS
Jaap Langenbach
Dwerssteech 8 8551 SB Wâldsein
Fryslân, Nederland,
Tel. + 31 514 - 592 536
Member of WWEA
![]()