DRONTEN / LELYSTAD
The eastern Dronten-part (Wind Farm Irene
Vorrink) is 40
meters from the dike in de water on steel piles. 19
Nordtank-turbines were placed in september '96 and 9 more
in may '97.
The Lelystad-part (Wind Farm Harrie van den Kronenberg) is the western-part with 18 Windmasters
sited on land along the dike. This farm replaced the
former 35 Windmasters 30/300 (built in 1995).
Province FLEVOLAND City Dronten Lelystad Manufacturer Nordtank Windmaster Number of turbines 28 18 Rotordiameter 43 43 m (two-bladed) Hubheight 50 50 m Capacity 600 750 kW Start operation May '97 June '97 Owner Utility NUON NUON