DETAILS OF DUTCH WINDFARMS

DRONTEN / LELYSTAD

The 10 kilometer windline of 46 turbines (30,3 MW) consists of two parts.

The eastern Dronten-part (Wind Farm Irene Vorrink) is 40 meters from the dike in de water on steel piles. 19 Nordtank-turbines were placed in september '96 and 9 more in may '97.
The Lelystad-part (Wind Farm Harrie van den Kronenberg) is the western-part with 18 Windmasters sited on land along the dike. This farm replaced the former 35 Windmasters 30/300 (built in 1995).

SEE A PICTURE OF DRONTEN-FARM

Province                       FLEVOLAND

City                Dronten              Lelystad
Manufacturer        Nordtank             Windmaster
Number of turbines  28                   18
Rotordiameter	    43                   43   m (two-bladed)
Hubheight           50                   50   m
Capacity	    600                  750  kW
Start operation	    May '97              June '97
Owner		    Utility NUON         NUON

 