DETAILS OF DUTCH WIND FARMS

Windfarm Urk, 15 MW
The farm was built in two fases, the southern 25 came first.
Province		Flevoland
Site		Along the dike, North from Urk
Manufacturer	Windmaster
Number of turbines  50
Rotordiameter:	25
Hubheight:	30
Capacity:		300  kW
Start operation:	Dec '87 and Okt. '91
Owner:		Utility ESSENT (former EDON)
See picture of 30 from 50 turbines
(Picture taken april ´02. Some turbines need repair after blade-failures)

All turbines turning (a rare situation, which lasted for half an hour)

(19 oktober 2008. At the table-site the dike of  "Noordoostpolder" was closed in 1937)

 

 
Repowering of the site is underway for some years now. It is expected that by 2011-2013
the farm of the 50 Windmasters will be replaced by three rows of ~ 17 turbines each
(total of ~ 350 MW). Two rows will stand in the water and one row along the dike.
 
A picture from an animation video of the project can be seen: Windkoepel NOP.jpg .
 
North and south from this site another total of ~ 150 MW is in planning.
More info at : Windkoepel NOP .

BACK TO   MAP OF WINDFARMS